NorthBay Logistics Center III

Vacaville, CA

  • ±404,950 SF
  • Divisible to ±73,240 SF
  • Situated on ±124.14 Gross AC
  • ±40 doors upgraded with lights & hydraulic levelers (25,000 & 45,000 lbs)
  • Eight (8) additional knock-out dock door openings
  • 15KVA/6,000 AMPS @ 227/480 volts at main substation divided into five (5) ​1,200 amp @ 277/480 volt subpanels
  • ±62' Deep x ±42' - ±56' Wide typical​​ column spacing

New Bay Area Distribution Center Available for Occupancy Summer '23

LDK Ventures has begun work on The NorthBay Logistics Center III (2030 & 2040 Cessna Dr. in Vacaville, CA) which consists of two industrial buildings totaling 427,000 square feet.

The project boasts excellent freeway access and is immediatedly adjacent to Vaca Valley Pkwy & I-505 interchange. Construction is planned to commence in September 2022. The buildings will range in size from 169,877 - 257,512 square feet. NorthBay Logistics Center III is anticipating first phase completion and ready for occupancy in summer 2023.

The logistics center will be built to Class A specifications with 36’ clear height, ESFR sprinklers, 208’ truck courts with ample trailer parking, dock and grade level access. Above standard parking - 515 vehicle and 98 trailer.

LDK partnered with PCCP as the equity partner on this development project.